Buying guides · Component selection
Ask what a date code can actually tell you
By VEQORIN · Published
“Recent date code” is common shorthand in a parts enquiry, but it leaves the supplier to guess what the buyer needs. Is there a contractual date limit? Does the receiving team need to match units to a particular lot? Is the concern about a moisture-sensitive package that may have been opened? Those are different questions. State the requirement before asking for a code.
Keep the part and the requirement together
Send the complete manufacturer part number, manufacturer, quantity and requested package format. If your purchase order or customer specification sets a date-code limit, provide the exact limit and how it will be checked. Ask whether the quoted quantity can meet it. Do not assume that a date printed on one sample label describes every unit in a mixed-lot shipment.
If the aim is traceability, ask what lot or shipment identifiers can be provided for the actual quoted goods and which document or label will carry them. Ask whether more than one lot or date code is involved. The available record depends on the manufacturer, product and supply route; confirm it for the proposed order rather than promising a particular certificate in advance.
Date and lot are not interchangeable
Manufacturer labels can carry several fields. An onsemi packaging guide, for example, lists the manufacturer part number, lot number and date code as separate label fields. TI distinguishes a ship trace code on its shipping label from a lot trace code marked on certain devices. Those examples explain why “send the date code” does not answer every traceability question. They do not establish the marking convention for another manufacturer's part.
Nor does a recent manufacturing date by itself prove authenticity, electrical performance or suitable storage. TI says the minimum useful life of its products is based on delivery to the customer rather than manufacturing date and discusses storage and moisture conditions separately. That is TI's stated policy for its products; it is not a blanket shelf-life claim for every component on this site.
Ask for evidence that answers the real concern
For the quotation, separate the requests:
| Question | What to ask the supplier to confirm |
|---|---|
| Is there a binding date limit? | The exact allowed range, the quoted lot/date information if available, and whether the full quantity meets the limit. |
| Is batch traceability required? | Which lot, shipment or label identifiers can accompany the actual order, and whether multiple lots are involved. |
| Is storage or assembly handling the concern? | Package and seal condition, moisture-sensitive handling information where applicable, and records relevant to that package. |
If the supplier cannot provide a requested identifier or document, record that as an open item before the order is approved. A photograph or an isolated code is not a substitute for matching the part, quantity and shipment records. The buyer's quality team decides what evidence is acceptable for its own requirement.
For a wider document request, see request component order documents. If dry-pack handling matters, see check MSL and dry-pack requirements. Put the exact MPN and acceptance requirements into the RFQ worksheet.
Sources and scope
- TI quality and packaging FAQs distinguish its ship and lot trace codes.
- TI product shelf-life guidance discusses delivery date, storage and moisture conditions for TI products.
- onsemi packaging and labeling guide shows separate MPN, lot and date fields in a documented label example.
This is a buying checklist. It does not certify any lot, label, source or device, and it does not replace the applicable manufacturer's instructions or the buyer's acceptance rules.