Buying guides · Component selection

Keep the approved BOM part visible when asking about an alternate

By VEQORIN · Published

A proposed alternative is easier to review when the original requirement stays on the same BOM line. Send the approved manufacturer and complete MPN first. Put any suggested replacement in a separate field and label it proposed — not approved. That lets the supplier quote the requested part without mistaking a possible cross for permission to change the design.

Say what prompted the request

Tell the supplier whether you are asking because of a discontinuance notice, a delivery constraint, or a request from the design team. Include the quantity, destination and required timing. If there is a manufacturer PCN or PDN, attach the notice and identify the affected ordering code and revision. A notice can name a replacement, but the approval decision still belongs to the design owner.

Compare exact parts, not category labels

Ask for the proposed manufacturer's full ordering code and its current datasheet. The design owner can then compare the package drawing and pinout, operating limits, electrical behaviour under the actual circuit conditions, environmental rating and any required approvals. What matters varies by part and application. A matching package name or a cross-reference search result is not enough on its own. TI distinguishes a drop-in replacement from a pin-for-pin part with different parameters and from parts that merely have similar functionality. ADI describes a case where apparently matching datasheet specifications did not ensure a working second source.

Keep the review outcome explicit: approved for this design and revision, rejected, or pending. If testing or a qualification sample is required, record that separately. Do not turn “pending” into an order substitution.

Send a clear two-part RFQ

For each affected line, include:

Original requirement Proposed alternative, if allowed
Approved manufacturer, complete MPN and BOM revision Proposed manufacturer and complete MPN
Quantity, required date and destination Reason for considering it and source of the suggestion
Mandatory package, documentation or inspection requirements Datasheet/drawing revision and design-owner approval status

Ask for a quote on the original MPN first, and for a separate option only if alternatives are permitted. A supplier can clarify the available commercial terms and provide documents for review; it cannot approve electrical interchangeability for the customer's circuit. If the proposal changes the part on the BOM, use the customer's own engineering change and purchasing approval process before ordering it.

For the starting list, see prepare a BOM for quotation. If a manufacturer notice prompted the request, see check PCN and discontinuance notices. When the requirements are ready, use the RFQ worksheet.

Sources and scope

This is a procurement checklist, not a VEQORIN compatibility recommendation. No specific alternate is endorsed here.